Optimización del procedimiento de control de calidad en pedraplenes y rellenos todo - unoaplicación a granitos, pizarras y jabres estabilizados con cemento
- TEIJON LOPEZ-ZUAZO, EVELIO
- Ángel Vega Zamanillo Director
- Miguel Ángel Calzada Pérez Director
Defence university: Universidad de Cantabria
Fecha de defensa: 27 June 2018
- Daniel Castro Fresno Chair
- Hernán Gonzalo Orden Secretary
- Diana Movilla Quesada Committee member
Type: Thesis
Abstract
Infrastructure quality control must be done through an adequate control process, which must be well planned, programmed and executed. It implies the revision of the specific control procedures as part of the general objective of continuous improvement. It must be applied to the construction of quarries with stone materials, called rockfills for large sizes or all-one fillings for intermediate products, there continues to be a problem in terms of compacting control methods in the execution of these diggings, with little practical development of new techniques when the spread is of good – quality material an aspect that must be revised so ensure the quality of the final result extended and compacted. Thus, the necessary field and laboratory works are developed in order to elaborate new test procedures for a proposed compaction control in rocks and soils stabilisation using cement